国产精品偷窥盗摄偷看无码_久久久久成人精品亚洲国产aⅤ无码毛片综合_黄色av网址在线_亚洲国产av午夜精品一区_丁香婷婷色五月基地_欧美亚洲另类图片区小说视频_gv天堂gv无码男同在线_亚洲AV永久无码浪潮AV软件_欧美在线观看乱妇视频_九久久伊人精品影院

News

Hvac knowledge: room air conditioning intercooler slight leakage of ammonia processing steps?
Release date:2013-03-25 Views:3567
1. The low pressure stage compressor emergency stop;
2. Quick closing solenoid valve or in front of the float valve for liquid valve, the coil into the liquid valve;
3. Open the drain valve, intercooler drainage barrels into the hydraulic valve, the drainage drainage barrel;
4. Open the high-pressure compressor fit;
5. The drainage 20 min after close the drain valve;
6. Time after high pressure stage compressor stop;
To repair, for welding shall be submitted to the approval, the safe production administration on the premise of ensure safety;
Can be back to normal after 8. Pressure testing, qualified production;
9. Object completely immediately after returning to normal production operation;
10. Make records.